fbpx

22.01.2024 — Wyndham Grand Residences Batumi Gonio. Aqua — Reinforcement frames are being prepared for installation on the 20th construction (19th hotel) floor. On the 13 (12) and 14 (13) floors, the walls are being laid with ceramic block.

Natalya
Sales manager
Customer Service Department Venyoo