fbpx

22.01.2024 — Wyndham Grand Residences Batumi Gonio. Aqua — Reinforcement frames are being prepared for installation on the 20th construction (19th hotel) floor. On the 13 (12) and 14 (13) floors, the walls are being laid with ceramic block.