fbpx

22.09.2024 — Wyndham Grand Residences Batumi Gonio. Villas — Villas 1, 2, 4: insulation of the foundation plinth. Villas 6-7: reinforcement of floor slabs. Villas 8-9: waterproofing of joints (laying polystyrene foam under the floor slab). Villas 11, 13: installation of foundation wall formwork. Construction materials are also being stored at the site and the fence foundation formwork is being installed.