fbpx

22.10.2023 — Wyndham Grand Residences Batumi Gonio. Aqua — On the 16th construction (15 hotel) floor the concreting of columns has taken place. On 7 (6) the laying of walls with ceramic block continues. On 14 (13) the ceramic block wall masonry has started.