fbpx

22.12.2023 — Wyndham Grand Residences Batumi Gonio. Aqua — Reinforcement of the columns of the 19th construction (18th hotel) floor has been completed and preparation for concreting has been carried out. Ceramic block wall masonry continues on the 12th (11th) floor.