fbpx

23.05.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — Ceramic block masonry walls are being laid on the 1st floor of Block A. Concreting of the floor slab in Block B has taken place. Installation of the floor slab formwork is underway at the infrastructure building.