23.10.2023 — Wyndham Grand Residences Batumi Gonio. Aqua — On the 16th construction (15 hotel) after concreting the dismantling of the column formwork is in progress. On the 6 (5), 7(6), 14 (13) floors, the masonry of walls with ceramic block continues. Construction materials are being loaded on the 7th (6) floor.