fbpx

24.01.2024 — Wyndham Grand Residences Batumi Gonio. Family Club — In Block A, after concreting of the 2nd stage of columns, the dismantling of their formwork is underway, and the installation of formwork for the 3rd floor floor slab has started. In Block B, preparation for concreting of the foundation slab is underway.