24.05.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — Ceramic block walling is underway on the 2nd floor of Block A. In Block B, reinforcement of vertical structures is underway. In block C the ground works are in progress. Installation of the floor slab formwork is taking place at the infrastructure building.