fbpx

25.03.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — Concreting of the foundation preparation for the infrastructure building has been carried out. Geodetic surveying of construction axes and block laying on floors is underway in Block A. In Block B, formwork installation of the 1st stage of vertical structures and reinforcement of the 2nd stage of the foundation slab continues. Excavation works are being carried out in Block C.