fbpx

25.07.2024 — Elite Family Residence — The installation of cold and hot water supply and heating systems, as well as the laying of elevator portals made of gas-silicate block is in progress. Screeding is in progress, as well as GKL-framework for storm drains and public areas. Tank connections, painting works in the mocap, installation of water supply meters and low-current fire extinguishing system are in progress.