25.11.2023 — Wyndham Grand Residences Batumi Gonio. Aqua — Formwork installation of the floor slab of the 18th construction (17th hotel) floor is in progress. Ceramic block wall masonry has started on the 9th (8) floor.

Natalya
Sales manager
Customer Service Department Venyoo