fbpx

25.11.2023 — Wyndham Grand Residences Batumi Gonio. Riviera — Block A: Installation of the formwork for the 2nd floor slab in the 1st half is in progress. Reinforcement of the 2nd floor columns is underway in the 2nd half. Block B: Excavation works are in progress.