26.07.2024 — Elite Family Residence — Installation works are in progress: cold/hot water supply systems, heating systems, water supply meters, low-current fire extinguishing system, GKL frames for storm drains and common areas. Painting works in the mocap and masonry works in the elevator shaft continue. The waterproofing of terraces and balconies, tank connections and screeding are in progress.