fbpx

27.02.2024 — Elite Family Residence — Protective wrapping of the installed stained glass windows continues on the floors. On the 5th construction (4 residential) floor stained glass windows are being installed. On the 6th (5) floor the masonry of fireplaces is in progress. The landscaping of the adjacent territory begins.