27.02.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — Dismantling of the formwork continues in block A. Assembly of the basement walls formwork is going on in the 1st part of block B, in the 2nd part of block B the concreting of the foundation preparation is carried out. The foundation for the foundation of block C has been started. In block E the walls are being laid with ceramic block.