fbpx

27.07.2024 — Elite Family Residence — Installation of low-current fire extinguishing system, cold/hot water supply and heating systems is in progress. Elevator portals are being laid, GKL-frames are being installed in common areas, mocap painting works and concrete screed is being applied.