27.10.2023 — Wyndham Grand Residences Batumi Gonio. Aqua — Reinforcement of the slab of the 17th construction (16th hotel) floor is in progress. On the 6th (5) and 7th (6) floors, the laying of walls with ceramic block continues. Loading of construction materials on the floors is in progress.