fbpx

27.12.2023 — Wyndham Grand Residences Batumi Gonio. Riviera — Block A Work continues on erection of 3rd floor column formwork in the 1st half and reinforcement of roof slab in the 2nd half. Block B Excavation works are in progress. Block E Laying of walls and internal partitions with ceramic block is carried out on the floors.