fbpx

28.12.2023 — Wyndham Grand Residences Batumi Gonio. Riviera — Concreting of columns was carried out in the 1st half of Block A, concreting of the roof slab took place in the 2nd half of the block. Excavation works continue in Block B. In Block E, walls and partitions are being laid with ceramic block on the floors.