29.02.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — In Block A, dismantling of the formwork and loading of ceramic block onto the floors is in progress. Reinforcement of the 2nd stage of the foundation slab continues in Block B. Excavation works are underway in Block C. In Block E the walls are being laid with ceramic block.