fbpx

29.05.2024 — Wyndham Grand Residences Batumi Gonio. Aqua — On the 9th construction (8 hotel) floor the installation of technological openings is in progress. On the 4th (3) floor, formwork installation, reinforcement and concreting of the balcony framing boards are in progress.