fbpx

29.09.2023 — Wyndham Grand Residences Batumi Gonio. Aqua — On the 15th construction (14 hotel) floor, the installation of column formwork has started and the installation of fence posts is in progress. On the 5th (4) floor, the masonry walls are being laid.