29.10.2023 — Wyndham Grand Residences Batumi Gonio. Aqua — Formwork installation and reinforcement of the floor slab continues on the 17th construction (16 hotel). On the 6th (5) and 7th (6) floors the walls are being laid with ceramic block. Preparation and loading of construction materials on the floors is in progress.