fbpx

29.11.2023 — Wyndham Grand Residences Batumi Gonio. Aqua — Reinforcement of the floor slab is underway on the 18th construction (17th hotel) floor. Work continues on wall masonry with ceramic block on floors 8 (7) and 9 (8).