fbpx

30.07.2024 — Wyndham Grand Residences Batumi Gonio. Aqua — The first batch of stained glass windows is being unloaded on the territory. On the 1st construction (Ground Floor) floor the walls are being laid with ceramic block. On the floors, work continues on the framing of balconies. On the 13th construction (12 hotel) floor the mocap is being made. The ceilings in the common areas are also being dedusted.