fbpx

30.09.2024 — Wyndham Grand Residences Batumi Gonio. Aqua — Balcony framing with reinforced concrete edges, balcony waterproofing, installation of decorative boxes, dusting of ceilings, construction of lift shafts, preparation for lift installation, construction of engineering holes, geodetic works are in progress. Installation of stained glass windows is in progress. On the 20th floor the installation of plasterboard frame of internal partitions and laying of ceramic block is in progress. On the 13th floor the installation of a balcony is in progress.