fbpx

30.09.2024 — Wyndham Grand Residences Batumi Gonio. Villas — Trenching for the gas pipe continues on site. Villas 1, 2 and 4: installation of reinforced column frame. Villa 3: installation of floor slab formwork. Villa 4: installation of column formwork. Villa 13: waterproofing of the foundation on the inside.