fbpx

31.10.2023 — Wyndham Grand Residences Batumi Gonio. Aqua — On the 17th construction (16 hotel) floor, the breaking of column axes has started. On the 7th (6) floor, the laying of walls with ceramic block continues. Preparation and loading of materials on the floors continues.