Elite Family Residence

1. Finishing work.
— Installation of baseboards and moldings.
— Painting baseboards, 4th floor.
— Travertine trim on balconies.

2. Facade works.
— Plastering of terraces.
— Plastering of balcony ceilings, 1 floor.
— Facing the facade with natural stone.

3. landscaping.
Facing the retaining wall with stone.

4. Arrangement of mocap.
Installation of furniture.

5. Installation of facade railings.