Elite Family Residence
1. Installation of ceramic granite tiles in the bathrooms, penthouses.
Continued ceramic granite tiling work.
2. Finishing works.
— Finishing works on the 1st, 2nd, 5th, floors.
3. Facade works.
Installation of the decorative elements on the balconies.
4. Wiring and plumbing.
5. Paving with travertine of the balconies’ parapets, penthouses.
6. Elevator installation.