Elite Family Residence — Preparation of staircase steps for marble cladding is in progress. Decorative elements on the eastern façade, decorative coating, finishing of terraces, installation of metal balcony railings (preparation for painting), waterproofing of terraces on the western side, installation of retaining wall formwork, plumbing works. On the ground floor – puttying. On the third and fourth floor – installation of plasterboard sheeting and ceilings in the bathrooms. On the fifth floor – plastering.