Wyndham Grand Batumi Gonio. Aqua — 1. diamond drilling of engineering holes The marking and drilling is carried out, which is necessary for the installation of communications of the future hotel. 2. Mocap arrangement, 12th floor Allows visualization and verification of the design and materials of the hotel room. 3. Facade arrangement, 2, 6, 9 floors Works on facade arrangement on balconies. Floor screed works. 4. Ceramoblock masonry, 2, 4, 6 floors Checking all dimensions and compliance with technological norms. 5. Preparatory work for installation of stained glass windows and installation of stained glass windows Preparation of borders for installation of stained glass windows. And installation of stained glass from 2 to 5 floors. 6. Preparatory work for installation of engineering networks Planning and marking the location of domestic sewerage, as well as water supply. 7. Installation of decorative boxes, 8th floor