fbpx

Wyndham Grand Batumi Gonio. Aqua — 1. Mocap Unit, 12th Floor Allow visualization and verification of hotel room design and materials. 2. Facade arrangement, 7th, 6th, 9th floors Facade works on balconies. 3. Installation of stained glass windows, 2-5 floors Arrange for the installation of stained glass windows. And installation of stained glass windows from 2 to 5 floors. 4. Installation of the ceiling frame on the balconies Provides strength and stability of the ceiling 5. Ceramoblock masonry, 2nd floor Checking all dimensions and compliance with technological norms. 6. Installation of storm water drainage system Also works on installation of decorative boxes from 8th to 14th floors, installation of gypsum plasterboard framework of walls, ceilings and columns are in progress.