Wyndham Grand Batumi Gonio. Family Club.

Block A
1. Facade construction.
— Works on facade insulation and partition walls on balconies.
— Plastering of walls on balconies, 1, 4 floors.

2. Plastering works, 5th floor.
Plastering of internal walls.

3. Arrangement of the ceiling frame on the balconies.
On the 2–3 floors.

4. Making metal boxes on balconies and terraces.

Block B
1. Plastering works.
Plastering of internal walls, 3rd floor.

2. Masonry works.
Ceramoblock masonry, 5th floor.

3. Installation of engineering systems.
Arrangement of storm water drainage risers.