Wyndham Grand Batumi Gonio. Family Club.
Block A
1. Plastering works.
— Plastering of walls, 2, 5 floors.
— Plastering of slopes, 4th floor.
2. Facade works.
Reinforcement of mineral wool, insulation of the facade.
3. Arrangement of gypsum plasterboard frame.
Installation of GKL partitions.
4. Arrangement of arches.
Manufacturing and installation of metal structures on the arches of balconies.
Improvement of the territory.
1. Arrangement of a fence.
Fence masonry.