Wyndham Grand Batumi Gonio. Family Club.
Block A
1. Plastering works.
— Plastering of walls, 2nd floor.
— Plastering of slopes, 3rd floor.
— Plastering of the roof parapet.
2. Arrangement of gypsum plasterboard frame.
Installation of GKL partitions.
3. Arrangement of arches.
Manufacturing and installation of metal structures on the arches of balconies.
Improvement of the territory.
1. Arrangement of fence
Fence masonry.