Wyndham Grand Batumi Gonio. Family Club. — Building A 1. Formwork is installed, concrete is poured and compacted. Upon completion of the concrete strength, the formwork is dismantled and the stained glass windows are installed. 2. Plastering of parapets, on the roof Includes the application of several layers of plaster to ensure a tight fit waterproofing. 3. Laying of ceramic blocks, 2nd floor Laying of ceramic blocks with observance of technology. Ensuring that the walls are level and vertical. Checking all joints and corners for compliance with design requirements. Building B 1. Ceramic block laying, 2nd floor Checking all dimensions and compliance with technological norms.