Wyndham Grand Batumi Gonio. Family Club. — The following works are carried out at the object: Building A 1. Arrangement of curbs for stained glass windows, 1st floor. Laying of curbs that meet the requirements for strength and waterproofing. 2. Plastering of parapets, roof. Plastering is performed in several layers to ensure the required strength and durability. After drying of the plaster, sanding and preparation for further finishing is carried out. 3. On the 2nd floor and balconies. Laying ceramic block. Laying ceramic block with observance of technology. Checking all joints and corners for compliance with the design requirements. 4. Dismantling of staircase formwork (duplexes) Building B 1. On the 2nd floor and balconies. Ceramoblock masonry. Checking all dimensions and compliance with technological norms. 2. Reinforcement of vertical structures, 4th floor. Laying of reinforcement frames in accordance with the norms. Checking for compliance with the project and controlling the quality of materials used.