Wyndham Grand Batumi Gonio. Riviera.

1. Block A. Facade works.
Reinforcement with mineral wool, facade insulation.

2. Block A. Gas mains connection.

3. Block A. Plastering of columns.

4. Block B, C. Facade works.
Doweling and reinforcement of the facade.

5. Block E. Plastering of roof parapet.

6. Block E. Waterproofing works.
Leveling of rear patio wall and floor surfaces prior to application of waterproofing.

7. Infrastructure Building.
Installation of storm water drainage ducts.