Wyndham Grand Batumi Gonio. Riviera.
1. Block A. Installation of engineering systems.
Electrical installation works, cable pulling and wiring.
2. Block A. Plastering works.
Plastering of columns in the basement.
3. Block B. Installation of engineering systems.
— Hot and cold water supply.
— Arrangement of
— Electrical installation works, cable pulling and wiring.
4. Block B. Facade works.
— Facade insulation, mineral wool installation.
— Arrangement of slopes.
5. Arrangement of storm water drainage.
Fabrication of storm water drainage boxes.