Wyndham Grand Batumi Gonio. Riviera.
1. Block A. Installation of engineering systems.
Electrical work, marking, fixing clips, wiring.
2. Block A. Installation of chimney boxes.
3. Block B. Installation of storm water drainage.
Installation of boxes under the storm sewerage system.
4. Block B. Installation of engineering systems.
Hot and cold water supply system and heating system.
5. Block A. Plastering works.
Plastering of the facade.
6. Block E. Installation of engineering systems.
Electrical wiring, marking, fixing clips, wiring of cables.
7. Infrastructure building.
Grinding of parapet surface.