Wyndham Grand Batumi Gonio. Riviera.
1. Block A. Installation of engineering systems.
Installation of
2. Block A. Plasterboard framing.
3. Block A. Plastering works.
Plastering of columns in the basement.
4. Arrangement of storm water drainage.
Fabrication of storm water drainage boxes.