Wyndham Grand Batumi Gonio. Riviera.

1. Block A. Plastering work.
Plastering columns in the basement.

2. Block A. Facade work.
Plastering the facade ends.

3. Block E. Installation of engineering systems.
Electrical installation work, marking, fastening clips, cable routing.
4. Infrastructure building.
Preparing the roof for waterproofing work.