Wyndham Grand Batumi Gonio. Riviera.

1. Block A. Plastering works.
Plastering of columns in the basement.

2. Block B. Installation of engineering systems.
Hot and cold water supply.

3. Block E. Installation of engineering systems.
Electrical installation works.

4. Arrangement of storm water drainage.
Fabrication and sealing of storm water drainage boxes.