Wyndham Grand Batumi Gonio. Villas. — 1. Removal of formwork, Villas 5, 6 To remove the temporary structure that supported the concrete before it cured, allowing further construction work to proceed. 2. Formwork erection, Villas 1,4 Required to create the mold into which the concrete will be poured, ensuring the correct geometry and quality of the structural elements. 2. Reinforcement of foundation walls, Villas 14, 15 Reinforces the strength of the walls, preventing them from collapsing under loads. 4. Waterproofing works, Villa 12 Waterproofing is necessary to protect the structure from water penetration, which prevents the destruction of materials and ensures the durability of the building.