Wyndham Grand Batumi Gonio. Villas. — The following works are being carried out at the site: 1. Villa 11, 13. Waterproofing of the floor slab. Application of waterproofing material. Followed by quality control and proper curing. 2. Removal of foundation wall formwork and strip footing. 3. Arrangement of reinforcement cages of columns. Assembly of reinforcement frames with their binding, installation in the design position with verification of verticality and final fixing to prevent displacement during concrete pouring.