Wyndham Grand Batumi Gonio. Aqua
1. Installation of engineering systems.
Plumbing work.
2. Installation of elevator shafts.
Installation of elevator equipment.
3. Installation of plasterboard frames.
Covering the perimeter of ceilings, installation of ceiling frames.
4. Plastering work.
Application of decorative plaster on balconies.
5. Infrastructure building.
Dismantling of formwork for vertical structures, 3rd floor.