fbpx

10.02.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — Dismantling of the floor slab formwork is underway in Block A. In the first part of Block B, reinforcement of the foundation slab is in progress, in the second part, excavation works are in progress. In Block E, walls and internal partitions are being laid with ceramic block on the floors.