05.03.2024 — Elite Family Residence — Work on the swimming pool is in progress. On the 6th (5th) floor the masonry of fireplaces is in progress. The bases for balcony railings are being installed on the floors.
05.03.2024 — Elite Family Residence — Work on the swimming pool is in progress. On the 6th (5th) floor the masonry of fireplaces is in progress. The bases for balcony railings are being installed on the floors.
Get personal advice from a specialist in branded real estate Wyndham Grand
Thank you for the application!
Within 5 minutes, our expert will contact you and tell you in detail about everything personally.
Get a consultation and gifts with purchases until December 31st