fbpx

27.03.2024 — Wyndham Grand Residences Batumi Gonio. Riviera — Ceramic block walls are being laid in Block A. Concreting of the walls of the basement floor of Phase 1 has been carried out in Block B. Reinforcement of the foundation of the infrastructure building has started.